Overload protection chamber for fluid separation apparatus and system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11964221
APP PUB NO 20210154597A1
SERIAL NO

16693879

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A mixed fluid separator apparatus includes an overload protection chamber that prevents a large and sudden influx of oil from fouling a coalescing separator. To prevent sudden influx of a large concentration of oil from overwhelming the coalescing separator, a separate overload protection chamber is connected to a main coalescing separator apparatus. The overload protection chamber includes a water drain (majority water with some oil) to the main coalescing separator apparatus and an oil overflow (majority oil with some water) to drain excess oil when necessary to prevent overfilling of the coalescing separator apparatus. The overload protection chamber functions to rapidly separate and remove heavy concentrations of oil, protecting the main coalescing separator apparatus.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • OSI ENVIRONMENTAL LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Corbin, Douglas C Twinsburg, US 5 29
Gaudiani, Michael A Shaker Heights, US 4 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 23, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 23, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 23, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00