Transmitter, receiver and transceiver

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11546002
APP PUB NO 20200328761A1
SERIAL NO

16843438

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A transmitter, a receiver and a transceiver are provided. The transceiver includes a hybrid transceiving circuit and a common-mode voltage control circuit. The hybrid transceiving circuit includes a digital-to-analog converter (DAC) circuit, a line driver coupled to the DAC circuit, a filtering and/or amplifying circuit coupled to the line driver, and an analog-to-digital converter (ADC) circuit coupled to the filtering and/or amplifying circuit. The common-mode voltage control circuit is electrically connected to a node of the hybrid transceiving circuit and is configured to detect a common-mode voltage of the node and to adjust the common-mode voltage of the node.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • REALTEK SEMICONDUCTOR CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, Shih-Hsiung Miaoli County, TW 128 276
Lin, Jian-Ru Nantou County, TW 25 47
Sung, Tung-Hung Kaohsiung, TW 1 0
Wang, Wei-Chou Hsinchu County, TW 18 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 3, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 3, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 3, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00