Apparatus for harvesting cannabis/hemp materials

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11382269
SERIAL NO

16807149

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus has a trailer with one or more wheels and a connector that connects the trailer to an automotive machine that mobilizes the trailer from a first position to a second position within a field of one or more plants. Further, the apparatus has a branch trimming device operably positioned on the trailer. Additionally, the apparatus has a conveyer belt operably positioned on the trailer. The conveyer belt receives a trimmed plant that has one or more branches trimmed off by the branch trimming device. The apparatus also has one more cutting devices. Finally, the apparatus has a tumbler that receives the trimmed plant from the conveyer belt and rotates with respect to the one or more cutting devices to cut the trimmed plant into the one or more buds. A bottom portion of the tumbler is positioned in proximity to the one or more cutting devices.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Scott, Bryan Seaside, US 25 248

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 12, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 12, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 12, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00