Homogenization of the energy input

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11230051
APP PUB NO 20200023578A1
SERIAL NO

16499701

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for providing control data for a generative layer construction device has a first step of accessing a data record which, at least for a partial region of an object cross section, specifies in which temporal sequence an energy beam bundle is to be moved in scanning lines over the places of this partial region to scan the buildup material. In a second step, the data record is changed such that in at least one of the layers for the respective partial region of an object cross-section, a check is carried out to determine whether the scan time required to scan the buildup material along a scanning line falls below a predefined minimum duration tmin and either a lower energy density of the energy beam bundle during scanning of the buildup material along this scanning line is specified and/or a wait time is specified before the energy beam bundle is moved along a further scanning line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • EOS GMBH ELECTRO OPTICAL SYSTEMS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Edelhäuser, Sebastian Zorneding, DE 3 2
Hümmeler, Ludger Gauting, DE 8 226
Hofbauer, Peter Munich, DE 100 1805
Schmitt, Christopher Munich, DE 15 104

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 25, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 25, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 25, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00