Transmitter and shortening method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11522561
APP PUB NO 20210044304A1
SERIAL NO

17083636

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A transmitter is provided. The transmitter includes: an outer encoder configured to encode input bits to generate outer-encoded bits including the input bits and parity bits; a zero padder configured to constitute Low Density Parity Check (LDPC) information bits including the outer-encoded bits and zero bits; and an LDPC encoder configured to encode the LDPC information bits, wherein the LDPC information bits are divided into a plurality of bit groups, and wherein the zero padder pads zero bits to at least some of the plurality of bit groups, each of which is formed of a same number of bits, to constitute the LDPC information bits based on a predetermined shortening pattern which provides that the some of the plurality of bit groups are not sequentially disposed in the LDPC information bits.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAMSUNG ELECTRONICS CO. LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jeong, Hong-sil Suwon-si, KR 415 5592
Kim, Kyung-Joong Seoul, KR 262 2410
Myung, Se-ho Yongin-si, KR 300 3156

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00