Fifth generation new radio uplink multiplexing assisted by shared grant-free transmission

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11936576
APP PUB NO 20220377788A1
SERIAL NO

17818104

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This document describes methods, devices, systems, and means for fifth generation new radio uplink multiplexing assisted by shared grant-free transmission. A user equipment (UE) inserts a first cyclical redundancy check (CRC) into a transport block (TB), encodes the TB, including the CRC, into a codeword (CW). Based on receiving a preemption indicator for part of a first physical resource, the UE selects a first part of the CW for rate matching with a length based on a received uplink (UL) grant and the received preemption indicator. The UE transmits the first part of the CW using the first physical resource, selects a second part of the CW, inserts a second CRC in the selected second part of the CW, and transmits the second part of the CW using a second physical resource.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GOOGLE LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chou, Kao-Peng Taipei, TW 15 34

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 19, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 19, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 19, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00