Circuit arrangement for transferring energy

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9960605
SERIAL NO

14884093

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A circuit arrangement for transferring energy includes an energy source, a control device and an energy distribution network. The energy distribution network has a base element and at least one load element. The base element includes a first intermediate circuit energy storage element which can be electrically connected to or disconnected from the energy source via two first controllable switching elements by way of the control device to form a first energy circuit. The at least one load element includes an energy consumer which can be electrically connected to or disconnected from the connections of the first intermediate circuit energy storage element via two second controllable switching elements by way of the control device to form a second energy circuit. The control device is designed to actuate the first and second switching elements of the respective energy distribution network such that that energy is transferred from the energy source to the energy consumer or the reverse, wherein a direct conductive connection between the energy source and the energy consumer does not exist at any time.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • BAYERISCHE MOTOREN WERKE AKTIENGESELLSCHAFT

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brueck, Rainer Lippstadt, DE 1 0
Epp, Christian Schongau, DE 4 1
Mayr, Roman Gilching, DE 7 44
Schulz, Michael Munich, DE 73 511
Voelkel, Holger Munich, DE 2 5
Wahl, Michael Siegen, DE 35 464

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 1, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 1, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00