Integrated chip with a gate structure over a recess

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11417741
SERIAL NO

16953921

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to an integrated chip comprising a substrate having a first top surface disposed at a first height, a second top surface disposed at a second height that is less than the first height, and a connecting surface extending from the first top surface to the second top surface. A first source/drain region is disposed along the first top surface of the substrate. A second source/drain region is disposed along the second top surface of the substrate and is laterally separated from the first source/drain region by a channel region of the substrate. A gate structure is arranged between the first source/drain region and the second source/drain region. The gate structure extends from over the first top surface of the substrate to over the connecting surface of the substrate. The gate structure also extends below the first top surface of the substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TAIWAN SEMICONDUCTOR MANUFACTURING COMPANY LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, Yong-Sheng Taipei, TW 15 8
Liu, Ming Chyi Hsinchu, TW 135 445

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 16, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 16, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 16, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00