Multi-tenant cloud native control plane system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11916775
SERIAL NO

18185967

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control plane system for providing data exchange between a plurality of gateway endpoints using a secure tunnel between the gateway endpoints. The system includes an end-user device, a cloud control plane, and a cloud provider. The end-user device includes a client endpoint providing a request for accessing data using a gateway device by sending data packets. The cloud control plane uses a data plane and a control plane for provisioning the request. The control plane is isolated from the data plane. Routing information of network traffic is received, a tenant associated with the request is identified and isolated. A network policy associated with the access to the data is identified based on the network patterns. The network policy specifies routing for access to the data and the secure tunnel. The access to the data is provided from the cloud provider to the client endpoint on the gateway device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NETSKOPE, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mukundan, Sunil Chennai, IN 38 3185
Rai, Anupam Fremont, US 6 139
Thakore, Parag Pritam Los Gatos, US 31 2417

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 27, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00