Through-tubing simultaneous gas and liquid production method and system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11566507
SERIAL NO

17003134

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system includes a first tubing arranged within a second tubing. A first flow path is formed within the second tubing, and a second flow path is formed between the first tubing and the second tubing. A pump is disposed within the first tubing and has a discharge end that is fluidly connected to the first flow path. A seal fitting coupled to a distal end of the first tubing includes a third flow path and a sealing arrangement to isolate the second flow path from a portion of an external environment of the first tubing. A gas separator is positioned to receive a fluid mixture stream from the third flow path and separate the fluid mixture stream into a gas stream that is directed into the second flow path and a liquid-rich fluid stream that is directed into the pump.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAUDI ARABIAN OIL COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ejim, Chidirim Enoch Dhahran, SA 48 118

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 31, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 31, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 31, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00