System and method for qualitative analysis of baseband building automation networks

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11424955
APP PUB NO 20200220744A1
SERIAL NO

16631403

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method is provided for qualitative analysis of baseband building automation networks. The system may include a processor configured to carry out a plurality of tests on a serial communication network that includes at least one field device that carries out building automation communications on the network. A first test may include: transmitting a series of queries for devices on the network, in which the queries are transmitted at incrementally lower transmission signal levels until message loss is detected; and determining a first lower signal level at which transmissions of queries occur without message loss on the network. In addition, the processor may be configured to determine and output on a display device at least one classification of the relative quality of the network with respect to at least one predetermined scale of relative network quality based at least in part on the first lower signal level.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SIEMENS INDUSTRY, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cabrera, Juan Buda, US 2 2
White, Joe Austin, US 12 94

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 23, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 23, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 23, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00