Bus interconnection system and method for detecting bad routing by the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11734212
APP PUB NO 20220405224A1
SERIAL NO

17524931

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bus interconnection system and a method for detecting bad routing by the same are provided. The bus interconnection system includes a master node, destination nodes, and a first order switch node. The destination nodes include slave nodes, the bus interconnection system assigns an identification symbol to each of the destination nodes, and adds a destination identification symbol to data sent to the slave nodes by the master node through the first order switch node. When the first order switch node receives the data, the first order switch node updates the destination identification symbol of the data according to a payload of the data, and when one of the destination nodes receives the data, the one of the destination nodes determines whether a bad routing occurs by checking whether the destination identification symbol is equal to the identification symbol assigned to the destination node that receives the data.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • REALTEK SEMICONDUCTOR CORP.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yu, Yung-Hui Hsinchu, TW 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 22, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 22, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 22, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00