Electrical current converter/rectifier with integrated features

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11834987
APP PUB NO 20220298968A1
SERIAL NO

17203348

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A propulsion system for use with an aircraft includes a gas turbine engine, an electric power system, and at least one propulsor. The gas turbine engine includes a compressor, a combustor, and a turbine. The electric power system includes a generator coupled to the gas turbine engine to generate electrical energy, power electronics connected to the generator to receive the electrical energy from the generator, and a motor configured to produce rotational energy in response to receiving electric energy from the power electronics. The propulsor is configured to use rotational energy received from the motor of the electric power system to generate thrust for propelling the aircraft.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROLLS-ROYCE CORPORATION450 S MERIDIAN STREET INDIANAPOLIS IN 46225

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Forsdike, John P E Indianapolis, US 5 12
Mohan, Kumar Palanisamy Jurong, SG 2 4
Murali, Rakesh Jurong, SG 7 6
Sivalingam, Krishnamoorthi Seletar, SG 18 45

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00