Carriage bases

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11780259
APP PUB NO 20210362534A1
SERIAL NO

17396494

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fluid ejection system can include a carriage base that includes a first pen slide at a bottom rear of the carriage base, a second pen slide at a front of the carriage base, and a pen guide at a top rear of the carriage base, the pen guide can include a guide portion to engage a substantially vertical portion of a back corner of a pen, a blocker portion to engage a substantially horizontal portion of the top back corner of the pen, and a pen guide corner formed between the guide portion and the blocker portion to hold a top back corner of a pen substantially in place during an angular loading of the pen.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HEWLETT-PACKARD DEVELOPMENT COMPANY, L.P.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sazon, Adnil San Dela Pena Singapore, SG 3 0
Teo, Cherng Linn Singapore, SG 19 86
Wang, Deyang Singapore, SG 8 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 10, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00