Multi-part brake rotor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11519472
APP PUB NO 20200278003A1
SERIAL NO

16645713

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A brake rotor, includes at least one friction element and one adapter element, wherein the brake rotor is configured to rotate about an axis of rotation, wherein the friction element has at least one friction surface and one connection region, wherein the adapter element has an installation region and a transfer region, wherein the installation region is configured for fixing the brake rotor to a hub, wherein the connection region indirectly or directly engages in positively locking fashion in a circumferential direction with the transfer region such that a torque about the axis of rotation can be transferred between the connection region and the transfer region from the friction element to the adapter element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAF-HOLLAND GMBH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Elmar, Weber Dülmen, DE 1 0
Naber, Thomas Josef Ahaus, DE 2 0
Roos, Michael Marktheidenfeld, DE 8 22
Wallmeier, Stefan Goldbach, DE 19 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00