Liquid de-entrainment in heat exchange equipment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11389745
APP PUB NO 20210178284A1
SERIAL NO

16950430

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A kettle reboiler includes a shell, a liquid reservoir defined within the shell to contain a first process fluid, and a tube bundle positioned within the liquid reservoir and at least partially submergible in the first process fluid, the tube bundle being configured to circulate a second process fluid that causes the first process fluid to boil and discharge a vapor-liquid mixture. A liquid-vapor separation assembly is positioned in the shell and includes a separation deck, and a plurality of separation devices mounted to the separation deck, each separation device being operable to de-entrain liquid from the vapor-liquid mixture and discharge a vapor. A vapor outlet nozzle is coupled to the shell to receive the vapor discharged from the plurality of separation devices.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • EXXON MOBIL TECHNOLOGY AND ENGINEERING COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Marut, Todd P Hamilton, US 6 65
Urbanski, Nicholas F Katy, US 25 197

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 19, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 19, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 19, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00