Shift register unit, driving method thereof, and gate driving circuit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11694628
APP PUB NO 20220262314A1
SERIAL NO

17661463

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A shift register unit, a driving method thereof, and a gate driving circuit are disclosed. The shift register unit includes: an input circuit configured to receive an input signal from an input signal terminal and output the input signal to a voltage stabilizer node; a voltage-stabilizing circuit configured to input potential of the voltage stabilizer node to a pull-up node and control potential of the voltage stabilizer node; an output circuit configured to receive a clock signal from a clock signal terminal and provide an output signal to an output signal terminal based on the clock signal received under control of the potential of the pull-up node; and a control circuit configured to control potential of the output signal terminal under control of the potential of the pull-up node.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HEFEI BOE JOINT TECHNOLOGY CO., LTD.; BOE TECHNOLOGY GROUP CO. LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Feng, Xuehuan Beijing, CN 164 521
Wu, Sixiang Beijing, CN 6 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 4, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 4, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 4, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00