Separation of viscous oils into components

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11753593
APP PUB NO 20220298427A1
SERIAL NO

17637218

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention provides methods for treating a source oil phase consisting of heavy oil, bitumen, a mixture of heavy oil and bitumen, a mixture of solvent and heavy oil or bitumen or both. The method comprises: introducing the source oil phase to a lower reservoir section of a device, flowing the source oil phase through an array of vertically extending heated pipes with an inert gas so as to thermally separate a vaporized light oil phase component from a heated liquid source oil phase, and segregating fluid flows by density in an upper fluid separating manifold to provide a light product fluid and a heavy product fluid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gates, Ian Donald Calgary, CA 17 233
Wang, Jingyi Calgary, CA 85 120

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 12, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00