Method for manufacturing electrostatic chuck having electrode layer including clad member and electrostatic chuck manufactured thereby

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11904390
APP PUB NO 20220355374A1
SERIAL NO

17733007

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This application relates to a method of manufacturing an electrostatic chuck having a high heat dissipation property and high thermal shock resistance and being lightweight, and an electrostatic chuck manufactured by the method. In one aspect, the method includes preparing a composite powder by milling (i) aluminum or aluminum alloy powder and (ii) carbon-based nanomaterial powder through ball milling. The method may also include manufacturing a multilayer billet including a core layer and one or more shell layers surrounding the core layer, in which at least one of the core and shell layers contains the composite powder. The method may further include extruding the multilayer billet to form an electrode layer and forming a dielectric layer on the electrode layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PUKYONG NATIONAL UNIVERSITY INDUSTRY-UNIVERSITY COOPERATION FOUNDATION365 SINSEON-RO NAM-GU BUSAN 48547

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kwon, Hansang Busan, KR 16 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 20, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00