Circuit selection of magnetic memory cells and related cell structures

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO RE47583
SERIAL NO

14638718

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A ferromagnetic thin-film based digital memory having a plurality of bit structures interconnected with manipulation circuitry having a plurality of transistors so that each bit structure has transistors electrically coupled thereto that selectively substantially prevents current in at least one direction along a current path through that bit structure and permits selecting a direction of current flow through the bit structure if current is permitted to be established therein. A bit structure has a nonmagnetic intermediate layer with two major surfaces on opposite sides thereof and a memory film of an anisotropic ferromagnetic material on each of the intermediate layer major surfaces with an electrically insulative intermediate layer is provided on the memory film on which a magnetization reference layer is provided having a fixed magnetization direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NVE CORPORATIONEDEN PRAIRIE MN 55344

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Daughton, James M Eden Prairie, US 44 1710
Everitt, Brenda A Minneapolis, US 13 215
Pohm, Arthur V Ames, US 36 1257

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 27, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 27, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00