Display panel and method of manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO RE47701
SERIAL NO

15266010

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A display apparatus includes an array substrate an opposite substrate facing the array substrate, and a liquid crystal layer disposed between the array substrate and the opposite substrate. The array substrate includes a display area, a non-display area, including first and second non-display areas, a pad area, the first non-display area adjacent to the pad area, a first base substrate disposed in the display area and in the non-display area, an organic polymer layer disposed in the pad area and in the first non-display area, a thin film transistor disposed in the display area, a pixel electrode connected to the thin film transistor, and a signal input pad connected to the thin film transistor and disposed on the organic polymer layer in the pad area. The organic polymer layer is disposed on the first base substrate in the first non-display area.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG DISPLAY CO LTDGYEONGGI-DO 17113

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jeon, Baekkyun Yongin-si, KR 39 171
Jung, Jin-Soo Hwaseong-si, KR 68 360
Kim, Young Gu Hwaseong-si, KR 82 323
Sung, Byoung-Hun Hwaseong-si, KR 44 243

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 5, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 5, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00