Generating downlink frame and searching for cell

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO RE47910
SERIAL NO

15461510

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a method for generating a downlink frame including generating a first short sequence and a second short sequence indicating cell group information, generating a first scrambling sequence determined by the first synchronization signal, generating a second scrambling sequence determined by the first short sequence, scrambling the first short sequence with the first scrambling sequence, scrambling the second short sequence with at least the second scrambling sequence, and mapping a second synchronization signal including the scrambled first short sequence and the scrambled second short sequence in the frequency domain.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ELECTRONICS AND TELECOMMUNICATIONS RESEARCH INSTITUTE161 GAJEONG-DONG YUSEONG-GU DAEJEON

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bang, Seung Chan Daejeon, KR 115 934
Chang, Kap Seok Daejeon, KR 51 262
Kim, Il Gyu Chungcheongbuk-Do, KR 137 1226
Kim, Young Hoon Daejeon, KR 211 6818
Ko, Young Jo Daejeon, KR 170 2679
Lee, Moon Sik Daejeon, KR 42 421
Park, Hyeong Geun Daejeon, KR 30 239
Yi, Hyo Seok Daejeon, KR 26 156

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 17, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 17, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00