Generation of HARQ-ACK information and power control of HARQ-ACK signals in TDD systems with downlink of carrier aggregation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO RE48606
SERIAL NO

16388384

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods and apparatus are provided for a User Equipment (UE) configured to have multiple cells in a DownLink (DL) of a Time Division Duplex (TDD) communication system so as to determine a power of an acknowledgement signal that the UE transmits in a control channel and to determine a number of acknowledgement information bits that the UE multiplexes with data information bits in a data channel. A transmission power of the control signal is determined based on DL Assignment Index (DAI) Information Elements (IEs) in DL Scheduling Assignments (SAs) that the UE detects through multiple transmission time intervals and through the multiple configured DL cells. The number of acknowledgement information bits in the data channel is determined based on a DAI IE of an UpLink (UL) SA associated with the transmission of the data channel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTDGYEONGGI DO SOUTH KOREA GYEONGGI-DO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cho, Joon-Young Suwon-si, KR 334 6891
Papasakellariou, Aris Houston, US 593 14874

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 22, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 22, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00