Method and apparatus for wheelbarrow front end protection

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO RE48973
SERIAL NO

16888565

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments of the invention are designed to be improvements over existing wheelbarrows. Certain embodiments comprise a frame, one or more weight-bearing wheels, and a pan. In certain embodiments, a wheelbarrow comprises a bight or a bumper having wheels. The wheels on the bight or bumper are located to the sides of a weight-bearing wheel. In certain embodiments, wheels located on each side of a bight or bumper portion allow a user to maneuver a wheelbarrow up or down a curb, or navigate stairs without causing damage to surfaces. Certain embodiments of the invention allow more efficient unloading of the contents of a wheelbarrow bed. Certain embodiments are designed to retrofit on existing wheelbarrows.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VECTION LIMITED4800 BASELINE RD #104 PMB-302 BOULDER CO 80303

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Beard, Bryan Denver, US 4 20
Meyer, Mathew D Erie, US 4 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 15, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 15, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 15, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00