Photovoltaic power plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO RE49376
SERIAL NO

15921272

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In large PV power plants, grounding of individual PV modules may lead to problems. The present invention overcomes such problems. The basis for the invention is a PV power plant comprising one or more PV generators, each comprising a PV string and an inverter with a DC input and an AC output. The PV string comprises at least one PV module and is electrically connected to the DC input of the inverter. The inverter comprises means for controlling the DC potential at the DC input depending on the DC potential at the AC output. The AC outputs of the inverters are coupled in parallel. The novel feature of the invention is that the PV power plant further comprises an offset voltage source, which controls the DC potential at the AC outputs. Thereby, the DC potential at the DC input will be indirectly controlled, and it is thus possible to ensure that the potentials with respect to ground at the terminals of the PV modules are all non-negative or all non-positive without grounding the PV modules. Ground loops can be avoided, and there is no need for the use of transformer-based inverters.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SMA SOLAR TECHNOLOGY AG34266 NIESTETAL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Borup, Uffe Soenderborg, DK 8 145
Haase, Frerk Harrislee, DE 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 17, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 17, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 17, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00