Power electronics assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO RE49723
SERIAL NO

17338794

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power electronics assembly for an electric motor controller. The power electronics assembly comprises an insulated metal substrate, a composite material substrate, and a bolt having a bolt head and a bolt shaft for mechanically coupling the composite material substrate to the insulated metal substrate. The power electronics assembly also includes an electrically conductive sleeve configured to be held between a first electrical contact carried by the insulated metal substrate and a second electrical contact carried by the composite material substrate and the bolt is configured to clamp the composite material substrate to the insulated metal substrate to force the electrically conductive sleeve against the first electrical contact and the second electrical contact.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TURNTIDE DRIVES LIMITEDGATESHEAD NE11 0QA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barrass, Peter Gateshead, GB 15 51
Jackson, Matt Gateshead, GB 6 20

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 7, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 7, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 7, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00