Method and apparatus for facilitating the operation of an on-site energy storage system to co-optimize battery dispatch

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO RE49731
SERIAL NO

17246213

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Various embodiments are provided for facilitating the operation and control of a fleet of on-site energy assets and optimizing energy dispatch across the fleet, thereby facilitating the use of the on-site energy assets instead of grid-supplied electric consumption. An example system may comprise a central platform and a plurality of on-site gateway devices configured to perform on-site asset control. An example method may comprise receiving a service availability call, performing fleet-level optimization, generating a set of site-level schedules, and causing, as a function of the site-level schedules, real-time on-site asset control. Other embodiments provide for determining a location of each grid-connected energy consumer at which to reduce grid-supplied energy consumption, determining an amount of a reduction of grid-supplied energy consumption, and transmitting a signal to each corresponding gateway device located at the determined location, the signal comprising data indicative of instructions for performing on-site energy dispatch.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SDG GRIDCO LLC2800 QUARRY LAKE DR SUITE 340 BALTIMORE MD 21209

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Knox, Kate San Francisco, US 3 100
Lee, Ja-Chin Audrey San Francisco, US 3 100
Noone, Corey San Francisco, US 3 100

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 21, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 May 21, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 21, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00