Shunt device in lighting control system without neutral wire

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO RE50126
SERIAL NO

17182309

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device id='REI-00001' date='20240917' (340, 440, 540)id='REI-00001' is connected to an output terminal of a controllerid='REI-00002' date='20240917' (330)id='REI-00002' , having a single input terminal connected to a first power terminal of an external power source id='REI-00003' date='20240917' (305)id='REI-00003' which outputs an AC voltage between the first power terminal and a second power terminal. The device includes a bleeding circuitid='REI-00004' date='20240917' (342, 442, 542)id='REI-00004' , and a switching arrangement id='REI-00005' date='20240917' (344/346, 444/446, 544/546)id='REI-00005' to detect whether the controller powers a load id='REI-00006' date='20240917' (320id='REI-00006' or disables the load. When the controller is in an OFF state, the switching arrangement connects the bleeding circuit between the output terminal of the controller and the second power terminal to provide a current path between the output terminal of the controller and the second power terminal. When the controller is in an ON state, the switching arrangement disconnects the bleeding circuit between the output terminal of the controller and the second power terminal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIGNIFY HOLDING B V5656 AE EINDHOVEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Shangwu Wheeling, US 10 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 17, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 17, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 17, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00