Uplink control information transmissions/receptions in wireless networks

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO RE50147
SERIAL NO

16566709

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and apparatus provide a user equipment (UE) configured to communicate with a plurality of carrier aggregation (CA) groups with at least a first CA group (CG1) and a second CA group (CG2). The UE includes processing circuitry. The processing circuitry is configured to determine whether the UE is power-limited. The UE is scheduled to transmit acknowledged information in a physical uplink shared channel (PUSCH) to a cell of the CG1 and uplink control information (UCI), other than the acknowledgement information, in a physical uplink control channel (PUCCH) to a cell of the CG2. The processing circuitry is also configured to, responsive to the UE being power-limited, prioritize the PUSCH for power allocation. The processing circuitry is also configured to transmit the PUSCH to the cell of the CG1.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTD129 SAMSUNG-RO YEONGTONG-GU SUWON-SI GYEONGGI-DO 16677

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nam, Young-Han Plano, US 240 9535
Ng, Boon Loong Plano, US 457 8737
Papasakellariou, Aris Houston, US 593 14874
Zhang, Jianzhong Plano, US 477 12090

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00