Air scrubber system with pipe assembly for in-line mixing to create an oxidation reduction potential (ORP) in water

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11352256
SERIAL NO

17672547

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An air scrubber system including a system for creating an oxidation reduction potential (ORP) in water is disclosed. The system includes a pipe assembly for in-line mixing. The pipe assembly includes a first flow path for water to flow through. The first flow path includes one or more ozone intake ports that are fluidically coupled to one or more ozone output ports of an ozone supply unit. The pipe assembly further includes a second flow path fluidically coupled in parallel with the first flow path. The second flow path includes a control valve that selectively permits a portion of the water to flow through the second flow path to produce a negative pressure in the first flow path so that ozone is drawn into the first flow path through the one or more ozone intake ports and mixed into the water flowing through the first flow path.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BIOSECURITY TECHNOLOGY LLC3821 S 148TH STREET OMAHA NE 68144

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lynn, Daniel W Omaha, US 56 488

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 7, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 7, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 7, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00