Side stream treatment for overflow

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11753322
APP PUB NO 20210087086A1
SERIAL NO

16862870

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method of treating wastewater. In one embodiment, the system comprises a biological reactor fluidly connected to a source of wastewater and having a treated wastewater outlet, a fixed film biological reactor connected to the source of wastewater and having a fixed film effluent outlet, and a ballasted system fluidly connected to the fixed film effluent outlet. The ballasted system may comprise a ballast reactor tank configured to provide a ballasted effluent, and a source of ballast material fluidly connected to an inlet of the ballast reactor tank. The system may further comprise a bypass line having an inlet fluidly connected to the source of wastewater, a first outlet fluidly connected to the ballasted system, and a second outlet fluidly connected to the fixed film biological reactor, the bypass line configured to bypass the fixed film biological reactor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EVOQUA WATER TECHNOLOGIES LLC210 SIXTH AVENUE SUITE 3300 PITTSBURGH PA 15222

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pino, Jelcic Sergio Waukesha, US 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 12, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 12, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 12, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00