Hybrid construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11001154
APP PUB NO 20190211528A1
SERIAL NO

16330149

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An HCU (37) includes a battery low temperature reducing output calculating section (71A) that determines, when it is determined that an electricity storage device (31) is in a low temperature state by a battery temperature Tb, a battery low temperature reducing output PbL that is made to a larger value as the battery temperature Tb is lower, a hydraulic oil low temperature reducing output calculating section (71B) that determines, when it is determined that hydraulic oil is in a low temperature state by a hydraulic oil temperature To, a hydraulic oil low temperature reducing output PoL that is made to a larger value as the hydraulic oil temperature To is lower, and an output command calculating section (80) that controls a vehicle body operation based upon a sum of the battery low temperature reducing output PbL and the hydraulic oil low temperature reducing output PoL.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI CONSTRUCTION MACHINERY CO LTDTOKYO 110-0015

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hita, Masafumi Tsuchiura, JP 17 41
Imura, Shinya Toride, JP 129 710

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 11, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 11, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00