Container comprising an arched base having stiffening bosses distributed in interlaced annular bands

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10717560
APP PUB NO 20190217985A1
SERIAL NO

16251695

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a container made of plastic material including a body extending along a longitudinal axis between an opening and a base, the base having: a seat forming a setting plane for the container; a concave arch, rotational around the longitudinal axis and extending from the vicinity of the seat to an amorphous central zone; and stiffening bosses that protrude from the concave arch and that extend radially to the interior of the arch. The stiffening bosses are angularly spaced from one another by alternating first bosses and second bosses that are distributed along: a first annular band in which the first bosses extend; and a third annular band in which the second bosses extend.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIDEL PARTICIPATIONSAVENUE DE LA PATROUILLE DE FRANCE OCTEVILLE-SUR-MER 76930

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Boukobza, Michel Octeville-sur-Mer, FR 49 701

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 21, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 21, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 21, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00