Method for providing a gate metal layer of a transistor device and associated transistor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9202695
APP PUB NO 20140332864A1
SERIAL NO

14271956

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method includes providing a dummy gate structure on a substrate. The dummy gate structure includes a gate dielectric layer and a dummy gate electrode layer, and is laterally defined by inner sidewalls of a set of spacers. The method also includes laterally embedding the dummy gate structure, removing the dummy gate electrode, and providing a final gate electrode layer in between the inner sidewalls of the set of spacers. Providing the final gate electrode layer further includes providing a diffusion layer that extends on top of the gate dielectric layer, on inner sidewalls of the spacers, and on a portion of a front surface of embedding layers for the dummy gate structure. Providing the final gate electrode also includes providing a metal on top of the diffusion layer, applying an anneal step, and filling the area in between the inner sidewalls of the set of spacers with a final gate metal filling layer. The present disclosure also relates to an associated transistor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • IMEC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Togo, Mitsuhiro Leuven, BE 35 201

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 1, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00