Rotary internal combustion engine, gas compressor, and liquid pump

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9714574
APP PUB NO 20160251961A1
SERIAL NO

15149808

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A rotatory internal combustion engine includes a power module, a housing configured to retain the power module and including an intake and an exhaust, and a first sleeve including a sleeve intake, a sleeve exhaust, and an injector port. The first sleeve is removably coupleable within the housing to form an intake flow path between the housing intake and the sleeve intake, and an exhaust flow path between the housing exhaust and the sleeve exhaust. The first sleeve is interchangeable with a second sleeve that has at least one of a sleeve intake, a sleeve exhaust, and an injector port different than the corresponding sleeve intake, sleeve exhaust, and injector port of the first sleeve, and that is configured to modify at least one of a torque output of the engine, a power output of the engine, and a fuel timing of the engine, compared to the first sleeve.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GOTEK ENERGY, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Farrenkopf, Bradley Scott Moorpark, US 6 10
Herbruck, Steven Lee Ojai, US 8 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 25, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 25, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00