Controlling user equipment nodes for enhanced uplink and user equipment nodes configured for enhanced uplink

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9736881
APP PUB NO 20160249403A1
SERIAL NO

15077364

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods for controlling uplink transmission of data to a network node of a communications system a user equipment node are disclosed. The methods include receiving parameters to configure enhanced uplink in CELL_FACH state, determining, whether the user equipment node is able to communicate on an E-DCH in CELL_FACH state and determining whether additional defined conditions have been satisfied, and performing a cell update operation to obtain an E-RNTI value responsive to determining that the User equipment node is not able to communicate on an E-DCH in CELL_FACH state. The methods may also include transmitting uplink data on an E-DCH transport channel to the network node responsive to determining that the user equipment node is able to communicate on an E-DCH in CELL_FACH state and determining that the additional defined conditions have been satisfied. Related user equipment nodes are also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TELEFONAKTIEBOLAGET LM ERICSSON (PUBL)SE-164 83 STOCKHOLM SE-164 83

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Curran, Mark County Carlow, IE 16 40
Pradas, Jose Luis Stockholm, SE 138 2272

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00