CONNECTIVITY CONTROL OF PHOTOVOLTAIC GENERATORS VIA POWER LINE COMMUNICATION
World Intellectual Property Organization Patent
Stats

Importance

WO Family Size
|
Non-US Coverage
|
Abstract
A remote resource (240) can be configured to control connectivity of the power generator modules (220-1, 220-2, 220-N) in a string. For example, a respective power generator module (220) can include a current sense circuit (330) that monitors for presence of communication signal (240-S). The power generator module (220) can monitor for a presence of a remotely generated control signal (240-S) over power line (250) that is used by the respective power generator module to convey power to the external load (230). If the control signal (240-S) is present on the power line (250), as generated by the remote resource (240), the control circuit (320) in the respective power generator module (220) activates the switch (350) to an ON state such that respective activated power generator module (220) is connected in series with the other activated power generator modules. If no keep-alive control signal (240-S) is detected within a timeout period, the controller (320) deactivates the respective power generator module (220).

First Claim
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Country Designations

Patent Owner(s)
- Owner owned or assignment not recorded
International Classification(s)

- [Classification Symbol]
- [Patents Count]
Inventor(s)
- No Inventor to display
Cited Art Landscape
- No Cited Art to Display

Full Text

Legal Events

Matter Detail

Renewals Detail

Add to Portfolio(s)
To add this patent to one, or more, of your portfolios, simply click the add button.
This Patent is in these Portfolios:

Add to additional portfolios:

Note
The template below is formatted to ensure compatibility with our system.
Provide tags with | separated like (tags1|tags2).
Maximum length is 128 characters for Customer Application No
Mandatory Fields * - 'MatterType','AppType','Country','Title','SerialNo'.
Acceptable Date Format - 'MM/DD/YYYY'.
Acceptable Filing/App Types -
- Continuation/Divisional
- Original
- Paris Convention
- PCT National
- With Priority
- EP Validation
- Provisional Conversion
- Reissue
- Provisional
- Foreign Extension
Acceptable Status -
- Pending
- Abandoned
- Unfiled
- Expired
- Granted
Acceptable Matter Types -
- Patent
- Utility Model
- Supplemental Protection Certificate
- Design
- Inventor Certificate
- Plant
- Statutory Invention Reg
Advertisement
Advertisement
Advertisement

Recipient Email Address

Recipient Email Address

Comment
Recipient Email Address

Success
E-mail has been sent successfully.
Failure
Some error occured while sending email. Please check e-mail and try again!
Important Notes on Latency of Status data
This Status indicator is an estimation based on the relevant document kind code. As such, it status will only indicate "Published" or "Granted". Expired, lapsed or abandoned statuses are not available in this release. Please refer to the legal status information for more information.
This status should not be taken as legal conclusion. No representations are made as to the accuracy of the status provided. Please consult a legal professional before relying on this status information.
Important Note on Priority Date data
This priority date is an estimated earliest priority date and is purely an estimation. This date should not be taken as legal conclusion. No representations are made as to the accuracy of the date listed. Please consult a legal professional before relying on this date.
Only for Granted EP cases
EP validations represent the countries in which the EP patent may be in force. Data is based on reporting from the various EP contracting states. The reporting consistency can vary across the countries.