E02D

Technology

Watch

Stats

Description

FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES

Subclasses

SubclassTitle
1/00 Investigation of foundation soil in situ (investigation involving boring or specially adapted to earth drilling E21B 25/00, E21B 49/00; investigating or analysing materials by determining their chemical or physical properties, in general G01N, e.g. sampling G01N 1/00)
1/02 Investigation of foundation soil in situ (investigation involving boring or specially adapted to earth drilling E21B 25/00, E21B 49/00; investigating or analysing materials by determining their chemical or physical properties, in general G01N, e.g. sampling G01N 1/00) before construction work
1/04 Investigation of foundation soil in situ (investigation involving boring or specially adapted to earth drilling E21B 25/00, E21B 49/00; investigating or analysing materials by determining their chemical or physical properties, in general G01N, e.g. sampling G01N 1/00) before construction work Sampling of soil
1/06 Investigation of foundation soil in situ (investigation involving boring or specially adapted to earth drilling E21B 25/00, E21B 49/00; investigating or analysing materials by determining their chemical or physical properties, in general G01N, e.g. sampling G01N 1/00) before construction work Sampling of ground water
1/08 Investigation of foundation soil in situ (investigation involving boring or specially adapted to earth drilling E21B 25/00, E21B 49/00; investigating or analysing materials by determining their chemical or physical properties, in general G01N, e.g. sampling G01N 1/00) after finishing the foundation structure
3/00 Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D)
3/02 Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) Improving by compacting (E02D 3/11 takes precedence; compacting soil locally before or while forming foundations E02D 27/26, E02D 27/28)
3/026 Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) Improving by compacting (E02D 3/11 takes precedence; compacting soil locally before or while forming foundations E02D 27/26, E02D 27/28) by rolling with rollers usable only for or specially adapted for soil compaction, e.g. sheepsfoot rollers (rollers for soil working in agriculture A01B 29/00; rollers for road paving, such rollers usable also for compacting soil E01C 19/23)
3/032 Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) Improving by compacting (E02D 3/11 takes precedence; compacting soil locally before or while forming foundations E02D 27/26, E02D 27/28) by rolling with rollers usable only for or specially adapted for soil compaction, e.g. sheepsfoot rollers (rollers for soil working in agriculture A01B 29/00; rollers for road paving, such rollers usable also for compacting soil E01C 19/23) Trench rollers
3/039 Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) Improving by compacting (E02D 3/11 takes precedence; compacting soil locally before or while forming foundations E02D 27/26, E02D 27/28) by rolling with rollers usable only for or specially adapted for soil compaction, e.g. sheepsfoot rollers (rollers for soil working in agriculture A01B 29/00; rollers for road paving, such rollers usable also for compacting soil E01C 19/23) Slope rollers
3/046 Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) Improving by compacting (E02D 3/11 takes precedence; compacting soil locally before or while forming foundations E02D 27/26, E02D 27/28) by tamping or vibrating, e.g. with auxiliary watering of the soil (E02D 3/026, E02D 3/08 take precedence; tamping or vibrating apparatus for working ballast on railways E01B 27/00, for consolidating paving materials E01C 19/3, for consolidating concrete in general E04G 21/06)
3/054 Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) Improving by compacting (E02D 3/11 takes precedence; compacting soil locally before or while forming foundations E02D 27/26, E02D 27/28) by tamping or vibrating, e.g. with auxiliary watering of the soil (E02D 3/026, E02D 3/08 take precedence; tamping or vibrating apparatus for working ballast on railways E01B 27/00, for consolidating paving materials E01C 19/3, for consolidating concrete in general E04G 21/06) involving penetration of the soil, e.g. vibroflotation
3/061 Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) Improving by compacting (E02D 3/11 takes precedence; compacting soil locally before or while forming foundations E02D 27/26, E02D 27/28) by tamping or vibrating, e.g. with auxiliary watering of the soil (E02D 3/026, E02D 3/08 take precedence; tamping or vibrating apparatus for working ballast on railways E01B 27/00, for consolidating paving materials E01C 19/3, for consolidating concrete in general E04G 21/06) Tampers with directly acting explosion chambers (pile drivers with explosion chambers E02D 7/12)
3/068 Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) Improving by compacting (E02D 3/11 takes precedence; compacting soil locally before or while forming foundations E02D 27/26, E02D 27/28) by tamping or vibrating, e.g. with auxiliary watering of the soil (E02D 3/026, E02D 3/08 take precedence; tamping or vibrating apparatus for working ballast on railways E01B 27/00, for consolidating paving materials E01C 19/3, for consolidating concrete in general E04G 21/06) Vibrating apparatus operating with systems involving reciprocating masses (E02D 3/054, E02D 3/061 take precedence)
3/074 Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) Improving by compacting (E02D 3/11 takes precedence; compacting soil locally before or while forming foundations E02D 27/26, E02D 27/28) by tamping or vibrating, e.g. with auxiliary watering of the soil (E02D 3/026, E02D 3/08 take precedence; tamping or vibrating apparatus for working ballast on railways E01B 27/00, for consolidating paving materials E01C 19/3, for consolidating concrete in general E04G 21/06) Vibrating apparatus operating with systems involving rotary unbalanced masses (E02D 3/054 takes precedence)
3/08 Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) Improving by compacting (E02D 3/11 takes precedence; compacting soil locally before or while forming foundations E02D 27/26, E02D 27/28) by inserting stones or lost bodies, e.g. compaction piles (sand drains for soil compaction E02D 3/1; stressing soil while forming foundations E02D 27/28)
3/10 Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) Improving by compacting (E02D 3/11 takes precedence; compacting soil locally before or while forming foundations E02D 27/26, E02D 27/28) by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains (E02D 3/11 takes precedence; soil-penetrating vibrators with auxiliary watering E02D 3/054; drainage of soil in general E02B 11/00)
3/11 Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) by thermal, electrical or electro-chemical means (freezing soil for interrupting passage of underground water E02D 19/14)
3/115 Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) by thermal, electrical or electro-chemical means (freezing soil for interrupting passage of underground water E02D 19/14) by freezing
3/12 Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) Consolidating by placing solidifying or pore-filling substances in the soil (making piles E02D 5/46; soil-conditioning or soil-stabilising materials C09K 17/00)

more results

Recent Patents

Not Available

Recent Publications

Not Available

Top Owners in This Class

Upgrade to the Professional Level to view Top Owners for this Class.Learn More

Applications Filed in This Class - By Year

Patents Issued To Date - By Filing Year

Average Time to Issuance