2025/0119,194 | METHOD FOR OPERATION OF DEVICE IN WIRELESS COMMUNICATION SYSTEM AND DEVICE USING SAME METHOD | Dec 28, 22 | Apr 10, 25 | Not available |
2025/0119,266 | WIRELESS RELAY DEVICE, COMMUNICATION DEVICE AND WIRELESS RELAY METHOD | Dec 27, 21 | Apr 10, 25 | NTT DoCoMo Inc. |
2025/0119,267 | COMMUNICATION APPARATUS, COMMUNICATION SYSTEM, AND COMMUNICATION METHOD | Sep 16, 24 | Apr 10, 25 | Not available |
2025/0119,268 | DORMANCY INDICATION IN FULL-DUPLEX SYSTEMS | Sep 18, 24 | Apr 10, 25 | Not available |
2025/0119,783 | SENSING MEASUREMENT METHOD AND DEVICE THEREOF | Dec 06, 24 | Apr 10, 25 | Not available |
2025/0119,912 | RESOURCE GAPS FOR FULL-DUPLEX COMMUNICATIONS BASED ON UPLINK AND DOWNLINK WAVEFORMS | Dec 16, 24 | Apr 10, 25 | Not available |
2025/0119,978 | Alignment of Discontinuous Reception for Sidelink Communication | Dec 16, 24 | Apr 10, 25 | Ofinno, LLC |
2025/0112,646 | THROUGH RECEIVE PATH FOR MULTIPLEXING BANDS IN CARRIER AGGREGATION | Sep 03, 24 | Apr 03, 25 | Not available |
2025/0112,744 | REFERENCE SIGNAL TRANSMISSION IN SUBBAND FULL-DUPLEX AND NON-SUBBAND FULL-DUPLEX SLOTS | Sep 29, 23 | Apr 03, 25 | Not available |
2025/0112,752 | POWER BOOSTING OF A CHANNEL STATE INFORMATION REFERENCE SIGNAL IN A SUB-BAND FULL DUPLEX SET OF SYMBOLS | Sep 28, 23 | Apr 03, 25 | Not available |
2025/0112,753 | Frequency Control for Improved Echo Cancellation in a Full-Duplex Link | Oct 02, 23 | Apr 03, 25 | Not available |
2025/0113,204 | ELECTRONIC DEVICE PERFORMING INTERFERENCE CANCELLATION AND OPERATING METHOD THEREOF | Dec 11, 24 | Apr 03, 25 | Samsung Electronics Co., Ltd. |
2025/0113,337 | SCHEDULED ENTITY BEHAVIOR IN FULL-DUPLEX SLOT FORMAT | Dec 12, 24 | Apr 03, 25 | Not available |
2025/0105,860 | METHODS AND ARRANGEMENTS FOR AN N-PATH FILTER USING A FOURTH ORDER ALL POLE DRIVING POINT IMPEDANCE | Sep 25, 23 | Mar 27, 25 | Intel Corp. |
2025/0105,874 | CABLE NETWORK SYSTEM FOR BIDIRECTIONAL COMMUNICATION AT AN ENCHANCED DUPLEX FREQUENCY RANGE | Dec 06, 24 | Mar 27, 25 | PPC Broadband, Inc. |
2025/0105,954 | OPTIMIZING UPLINK BAND SCHEDULING OF CONTIGUOUS AND NON-CONTIGUOUS FREQUENCY RANGE 1 (FR1) AND FREQUENCY RANGE 2 (FR2) SPECTRUM | Dec 06, 24 | Mar 27, 25 | Not available |
2025/0105,980 | METHOD AND APPARATUS FOR CONFIGURING RESOURCES FOR SBFD OPERATION | Aug 22, 24 | Mar 27, 25 | Not available |
2025/0105,991 | COMMUNICATIONS BY A SUBBAND FULL DUPLEX CAPABLE USER EQUIPMENT IN A HALF DUPLEX CELL MODE | Sep 22, 23 | Mar 27, 25 | Not available |
2025/0105,992 | Radio Network Node, User Equipment and Methods Performed Therein | Dec 27, 22 | Mar 27, 25 | Not available |
2025/0105,993 | DOWNLINK (DL) OR UPLINK (UL) TRANSMISSION IN DUPLEX OPERATION | Apr 04, 23 | Mar 27, 25 | Not available |