E01D 12/00

Technology



back to "E01D 12/00" profile

More Results

Patent/Pub #TitleFiling DateIssue/Publication DatePatent Owner
2024/0263,407 LARGE-SPAN CORRIDOR STRUCTURE COMPOSED OF ARC-SHAPED CANTILEVER TRUSSES AND STAY CABLE SUPPORTING STRUCTURES AND CONSTITUTING METHOD THEREOFSep 26, 22Aug 08, 24Zhejiang University City College
2024/0093,443 DOUBLE-DECK MULTI-SPAN BRIDGE CONSTRUCTION METHODSep 23, 21Mar 21, 24CHINA CONSTRUCTION SCIENCE AND INDUSTRY CORPORATION LTD
2011/0113,701 DEVICE FOR ATTACHING HAUNCH CARRIER TO A BRIDGE BEAM MEMBERNov 18, 09May 19, 11Not available
2010/0299,851 ENCLOSED BRIDGESep 19, 08Dec 02, 10Not available
2010/0071,140 FLUID FLOW SYSTEM BRIDGE WITH WALKWAYSep 23, 09Mar 25, 10Petroleum Specialty Rental, LLC