2017/0058,869 | CONDUIT ASSEMBLY FOR A LIGHTNING PROTECTION CABLE OF A WIND TURBINE ROTOR BLADE | Aug 27, 15 | Mar 02, 17 | GENERAL ELECTRIC COMPANY |
2016/0377,061 | Turbine Main Bearing Lubrication | Apr 30, 14 | Dec 29, 16 | INSIGHT ANALYTICS SOLUTIONS HOLDINGS LIMITED |
2016/0356,266 | System and Method for Reducing Torsional Movement in a Wind Turbine Tower | Jun 03, 15 | Dec 08, 16 | GENERAL ELECTRIC COMPANY |
2016/0333,859 | WIND TURBINE BEARING ASSEMBLY | May 13, 15 | Nov 17, 16 | Not available |
2016/0333,860 | WIND TURBINE YAW BEARING PRE-LOAD | May 13, 15 | Nov 17, 16 | Wind Solutions, LLC. |
2016/0333,861 | LIGHTNING PROTECTION SYSTEM FOR WIND TURBINE ROTOR BLADES | May 13, 15 | Nov 17, 16 | GENERAL ELECTRIC COMPANY |
2016/0230,744 | WIND TURBINE WITH DUAL BLADE ASSEMBLIES | Feb 11, 15 | Aug 11, 16 | Not available |
2016/0222,945 | Wind Power Generation Apparatus | Feb 02, 16 | Aug 04, 16 | HITACHI, LTD. |
2016/0201,653 | WIND TURBINE FOUNDATION AND WIND TURBINE | Aug 05, 14 | Jul 14, 16 | WOBBEN PROPERTIES GMBH |
2016/0195,067 | WIND TURBINE TOWER WITH AN ELEVATOR SYSTEM | Sep 11, 15 | Jul 07, 16 | SIEMENS AKTIENGESELLSCHAFT |
2016/0195,068 | LIGHTNING PROTECTION SYSTEM FOR A WIND TURBINE | Mar 16, 16 | Jul 07, 16 | SIEMENS AKTIENGESELLSCHAFT |
2016/0195,070 | FLARE-TYPE TENSILE LEGS FLOATING WIND TURBINE BASE, OFFSHORE WIND TURBINE AND CONSTRUCTION METHOD | Feb 12, 15 | Jul 07, 16 | XINJIANG GOLDWIND SCIENCE & TECHNOLOGY CO., LTD. |
2016/0186,726 | WIND-ENERGY CONVERSION SYSTEM AND METHODS APPARATUS AND METHOD | Dec 31, 14 | Jun 30, 16 | SHEER WIND, INC. |
2016/0186,727 | WIND-ENERGY CONVERSION SYSTEM AND METHODS APPARATUS AND METHOD | Dec 31, 14 | Jun 30, 16 | SHEER WIND, INC. |
2016/0186,728 | SYSTEM AND METHODOLOGY FOR A WIND TURBINE | Feb 24, 16 | Jun 30, 16 | HOVER ENERGY, LLC |
2016/0177,926 | SYSTEM AND METHOD FOR SECURING A CONDUCTIVE CABLE WITHIN A WIND TURBINE ROTOR BLADE | Dec 18, 14 | Jun 23, 16 | GENERAL ELECTRIC COMPANY |
2016/0169,203 | WIND TURBINE | Jul 18, 14 | Jun 16, 16 | WOBBEN PROPERTIES GMBH |
2016/0169,204 | STATIC TESTING AND CALIBRATING METHOD FOR PID LINK OF CONTROL SYSTEM OF WIND TURBINE | Dec 10, 14 | Jun 16, 16 | GANSU ELECTRIC POWER COMPANY OF STATE GRID, STATE GRID CORPORATION OF CHINA, WIND POWER TECHNOLOGY CENTER OF GANSU ELECTRIC POWER COMPANY, |
2016/0169,205 | METHOD FOR CONSTRUCTING WIND POWER CONNECTION SYSTEM MODEL BASED ON MEASURED DATA | Dec 10, 14 | Jun 16, 16 | GANSU ELECTRIC POWER COMPANY OF STATE GRID, STATE GRID CORPORATION OF CHINA, WIND POWER TECHNOLOGY CENTER OF GANSU ELECTRIC POWER COMPANY, |
2016/0169,207 | TRANSMISSION FOR A WIND TURBINE GENERATOR | Jun 17, 14 | Jun 16, 16 | VESTAS WIND SYSTEMS A/S |