Variable cache line size management

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8943272
APP PUB NO 20130111136A1
SERIAL NO

13451742

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one aspect of the present disclosure, a method and technique for variable cache line size management is disclosed. The method includes: determining whether an eviction of a cache line from an upper level sectored cache to an unsectored lower level cache is to be performed, wherein the upper level cache includes a plurality of sub-sectors, each sub-sector having a cache line size corresponding to a cache line size of the lower level cache; responsive to determining that an eviction is to be performed, identifying referenced sub-sectors of the cache line to be evicted; invalidating unreferenced sub-sectors of the cache line to be evicted; and storing the referenced sub-sectors in the lower level cache.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTERNATIONAL BUSINESS MACHINES CORPORATIONNEW ORCHARD ROAD ARMONK NY 10504

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bell,, Jr Robert H Austin, US 73 1222
Chen, Wen-Tzer T Austin, US 22 268
Flemming, Diane G Pflugerville, US 31 459
Hua, Hong L Austin, US 24 403
Maron, William A Austin, US 49 692
Srinivas, Mysore S Austin, US 50 602

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 27, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00