Superconducting airbridge crossover using superconducting sacrificial material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10170817
APP PUB NO 20170062898A1
SERIAL NO

14749143

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A technique relates to a superconducting airbridge on a structure. A first ground plane, resonator, and second ground plane are formed on a substrate. A first lift-off pattern is formed of a first lift-off resist and a first photoresist. The first photoresist is deposited on the first lift-off resist. A superconducting sacrificial layer is deposited while using the first lift-off pattern. The first lift-off pattern is removed. A cross-over lift-off pattern is formed of a second lift-off resist and a second photoresist. The second photoresist is deposited on the second lift-off resist. A cross-over superconducting material is deposited to be formed as the superconducting airbridge while using the cross-over lift-off pattern. The cross-over lift-off pattern is removed. The superconducting airbridge is formed to connect the first and second ground planes by removing the superconducting sacrificial layer underneath the cross-over superconducting material. The superconducting airbridge crosses over the resonator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • IBM CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Josephine B Bedford Hills, US 263 5090
Cotte, John M New Fairfield, US 83 1026

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 1, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 1, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00