Method for manufacturing semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9461176
APP PUB NO 20140206133A1
SERIAL NO

14154799

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

To reduce defects in an oxide semiconductor film in a semiconductor device. To improve electrical characteristics of and reliability in the semiconductor device including an oxide semiconductor film. A method for manufacturing a semiconductor device includes the steps of forming a gate electrode and a gate insulating film over a substrate, forming an oxide semiconductor film over the gate insulating film, forming a pair of electrodes over the oxide semiconductor film, forming a first oxide insulating film over the oxide semiconductor film and the pair of electrodes by a plasma CVD method in which a film formation temperature is 280° C. or higher and 400° C. or lower, forming a second oxide insulating film over the first oxide insulating film, and performing heat treatment at a temperature of 150° C. to 400° C. inclusive, preferably 300° C. to 400° C. inclusive, further preferably 320° C. to 370° C. inclusive.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SEMICONDUCTOR ENERGY LABORATORY CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hiraishi, Suzunosuke Tochigi, JP 35 401
Koezuka, Junichi Tochigi, JP 364 5691
Okazaki, Kenichi Tochigi, JP 347 4065
Shima, Yukinori Tatebayashi, JP 170 2333

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 4, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 4, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00